How Long Does It Take To Install Helical Piers







If you are looking for a solution for your foundation problems, look here to find out how long it takes to install helical piers and learn why this innovative solution can quickly solve your issues.

Time for Prep Work

The majority of the time it takes to get helical pier installation is taken up by the prep work that’s necessary before construction. Between getting the required inspections, permits, and engineer certifications, time can quickly start to add up—and that isn’t even accounting for the time the foundation repair company will require to prepare. You’ll have to wait until they have the proper materials necessary for installation as well as free time in your schedule.


If you live in a small town, this preparation time should be much shorter, as cities should be able to process your building permit quickly. In some cases, they can do it in as little as a few days or weeks. However, in larger cities, like Chicago or Detroit, you may have to wait six to eight weeks, or even three months, for a permit to get processed and approved.


Many cities will also require that you have a footing inspection and engineer certification letter to begin pier installation. An engineer should only need a few hours to conduct an inspection it will then take a week or two for them to write their report. Our in-house engineers can perform these inspections when for our piers. Our team will also take soil samples of your lot so that we know what to expect when digging under your foundation.


For commercial projects, you’ll need a special inspector to monitor installation, so you’ll need to account for the time it will take to book them.

New Construction

Since there is less to work around with new construction, you can add many helical piers in a single day. Depending on the project, you can install approximately 30 or more piers a day. So, unless you are working with a massive structure, you might be able to complete the project in a day.

Existing Structures

When dealing with existing structures, you install between four to six piers a day. With each pier being about to hold about a ton each, many residential jobs can get done within the same day. This time frame also considers the time it takes for digging around the foundation before installing, along with the hours needed to rebury it.


After checking out how long it takes to install helical piers, it should be easy to see why so many people turn to them as a solution when their foundation is sinking. If you want to skip brokers and go straight to the manufacturer when choosing between helical pier companies, opt to use the world-class team at Helical Pier Distributions, LLC.